Everything we do is supported by digital thinking. From early studies to long-term asset performance, technology helps us move projects forward while staying grounded in real-world needs and national development priorities.

Everything we do is built on a single idea. Progress should move forward without disrupting the systems, relationships and identities that hold communities together.

Everything we do is built on a single idea. Progress should move forward without disrupting the systems, relationships and identities that hold communities together.

Transport

Transport Project

Nagpur–Mumbai Expressway

Location: Nagpur-Mumbai, Maharashtra | Project Cost: Approx. USD 6,722 Million

We served as Programme Management Consultants for this project, establishing control mechanisms, driving project strategising and overseeing tracking and monitoring, while also supporting the optimisation of design and materials.

View project details ▼
Transport Project

Pune Ring Road

Location: Pune, Maharashtra | Project Cost: Approx. USD 5,060 Million

We were engaged as Project Support Office (Nodal Consultant), supporting transaction advisory, bid process management, overall project management and project controls, including performance management of contractors and Project Management Consultants.

View project details ▼
Transport Project

Bharatmala Pariyojana

Location: Rajasthan | Project Cost: Approx. USD 855 Million

We provided consultancy for DPR preparation for the Rasisar-Deogarh section of NH-754K, part of the Amritsar-Jamnagar Economic Corridor under Bharatmala Pariyojana.

View project details ▼
Transport Project

Greenfield Konkan Expressway

Location: Mumbai-Goa, Maharashtra | Project Cost: Approx. USD 9,400 Million

We were appointed as DPR Consultants for two packages, carrying out alignment studies, supporting land acquisition, undertaking financial feasibility analysis, preparing DPRs and facilitating statutory clearances.

View project details ▼
Transport Project

Goregaon–Mulund Link Road

Location: Mumbai, Maharashtra | Project Cost: USD 160 Million

We carried out the feasibility study, alignment finalisation, structural design, DPR preparation, bid process management and project management consultancy for this corridor.

View project details ▼
Transport Project

Mankoli–Mothagaon Link Road

Location: Bhiwandi, Thane, Maharashtra | Project Cost: USD 9.1 Million

We served as Project Management Consultants for this link road, covering studies, investigations, surveys, construction supervision, monitoring, coordination with statutory bodies and periodic reporting.

View project details ▼

Marine

Marine Project

Versova–Bandra Sea Link

Location: Mumbai, Maharashtra | Project Cost: Approx. USD 855 Million

We served as DPR Consultants, delivering planning and detailed design, estimation, financial analysis, environmental and social impact assessment and procurement advisory in collaboration with project partners.

View project details ▼
Marine Project

Versova–Virar Sea Link (Uttan–Virar)

Location: Mumbai, Maharashtra | Project Cost: USD 7.7 Billion

We served as Detailed Design Consultants, with our role spanning planning, design, estimation, financial analysis, environmental and social impact assessment, obtaining statutory clearances, land acquisition and procurement advisory.

View project details ▼
Marine Project

Vadhavan Greenfield Port

Location: Palghar, Maharashtra | Project Cost: 8 Billion

We provided services across master planning, design, cost estimation, detailed engineering, environmental and social impact assessment, land acquisition planning and financial modelling.

View project details ▼
Marine Project

Coastal Berth at JN Port

Location: JNPA, Maharashtra | Project Cost: Approx. USD 17.5 Million

We served as Programme Management Consultants, supporting technical and administrative coordination for the implementation and management of the project.

View project details ▼

Social & Community Infrastructure

Social Project

Foot-over Bridges

Location: Mumbai, Maharashtra | Project Cost: Approx. USD 6.12 Million

We provided structural design, bid process management and project management services for this foot-over bridge project.

View project details ▼

Industry

Industry Project

Special Economic Zone

Location: Navi Mumbai, Maharashtra | Project Cost: Approx. USD 58 Million

We provided project management services for this development, including supervision, QA/QC, design review, contract management, bill checking and commissioning planning.

View project details ▼
Industry Project

IT Infrastructure

Location: Mumbai, Maharashtra | Project Cost: Approx. USD 24.46 Million

We carried out inception studies, pre-feasibility analysis, DPR preparation, development of technical, commercial and cost-benefit models and preparation of RFPs.

View project details ▼
Industry Project

Cement Plant at MAHAGENCO

Location: Koradi, Khaperkheda & Chandrapur, Maharashtra | Project Cost: Approx. USD 90 Million

We conducted studies to assess technical feasibility and financial viability, identify project risks and define the actions required for construction, erection and commissioning.

View project details ▼

Landmark work that reflects our commitment to progress with identity.

Our projects span transport, water, property, urban planning and healthcare. Each one carries the same intention. Strengthen how people live and move, while respecting the character of the place.

This section will showcase key projects from each business vertical in a format that is easy to explore. Projects can be displayed as a timeline, a grid, or category-wise cards, depending on the final design direction.

Project Overview

Also known as the Hindu Hrudaysamrat Balasaheb Thackeray Maharashtra Samruddhi Mahamarg, this high-speed, access-controlled expressway was developed to significantly reduce travel time between Nagpur and Mumbai while supporting long-term regional growth.

Key Project Facts

Location: Nagpur–Mumbai, Maharashtra
Total Length: 701 km
Design Speed: 150 kmph
Configuration: 6-lane divided carriageway
Right of Way: 120 m
Interchanges: 24
Major Bridges: 65
Tunnels: 6
Project Cost: Approx. USD 6,722 million

Role and Scope

Programme management responsibilities included establishing robust control mechanisms, proactive strategising, progress tracking and performance monitoring, along with optimisation of design and material usage across the corridor through project management consultancy infrastructure.

Project Impact

The expressway has delivered measurable improvements in regional mobility and efficiency. Designed to reduce congestion and streamline long-distance travel, the corridor has improved how people and goods move across Maharashtra.

Impact indicators identified through project planning and assessment frameworks include:

  • Travel time reduction of approximately X% between Nagpur and Mumbai
  • Average distance savings of X km per journey compared to legacy routes
  • Fuel savings estimated at X million litres annually due to improved traffic flow
  • Carbon emissions reduced by approximately X tonnes per year
  • Improved logistics efficiency, supporting faster freight movement and regional economic activity